• Factory Supply M Ercury Distiller/M Ercury Retort for Gold Washing Gold Recovery Energy & Mining
  • Factory Supply M Ercury Distiller/M Ercury Retort for Gold Washing Gold Recovery Energy & Mining
  • Factory Supply M Ercury Distiller/M Ercury Retort for Gold Washing Gold Recovery Energy & Mining
  • Factory Supply M Ercury Distiller/M Ercury Retort for Gold Washing Gold Recovery Energy & Mining
  • Factory Supply M Ercury Distiller/M Ercury Retort for Gold Washing Gold Recovery Energy & Mining
  • Factory Supply M Ercury Distiller/M Ercury Retort for Gold Washing Gold Recovery Energy & Mining

Factory Supply M Ercury Distiller/M Ercury Retort for Gold Washing Gold Recovery Energy & Mining

Customized: Customized
Eco-Friendly: Eco-Friendly
Certification: CIQ, CE, ISO
Usage: Food, Tea, Chemical, Aerosol
Material: Plastic
Type: Tank Container
Customization:
Diamond Member Since 2023

Suppliers with verified business licenses

Guizhou, China
to see all verified strength labels (11)
  • Overview
  • Product Description
  • Detailed Photos
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
TR
Applicable Industries
Building Material Shops, Energy & Mining
Core Components
Steel Material
Key Selling Points
Low Maintenance Cost
Condition
New
Product Name
M Ercury Distill
Color
Can Be Customized
Dimension(L*W*H)
L*W 2000X1500mm
Product Content
98%
Product
Gold Refining Amalgamator
Transport Package
34.5kg/Can
Specification
99.999%Min
Trademark
tr
Origin
China
Production Capacity
1000 Ton/Month

Product Description

Product Description
Factory Supply M Ercury Distiller/M Ercury Retort for Gold Washing Gold Recovery Energy & Mining
M ercury distiller is a distillation equipment commonly used in small and medium-sized mines. Because the gasification temperature of m ercury is lower than the melting point and boiling point of gold, the m ercury and gold in the m ercury paste are separated by distillation, and the solid m ercury paste produced by the gold concentrator can be distilled regularly.
 
  During operation, the solid amalgam is placed in a sealed cast steel tank, the roof of which is connected to an iron pipe containing a condensing pipe. The can is heated in a heating furnace such as coke, gas or electric furnace, and when the temperature slowly rises to 356 degrees, the m ercury in the m ercury paste is vaporized and escapes along the iron pipe, and is recovered in a spherical drop below the container of water after condensation.
  
  In order to fully separate the m ercury in the m ercury paste, many
gold processing plants will control the temperature of m ercury evaporation at 400-450 degrees, and the temperature will rise to 750-800 degrees in the later stage of m ercury evaporation, and remain for 30 minutes. The m ercury evaporation time is 5-6 hours, and the recovery rate of m ercury in the m ercury evaporation operation is usually greater than 99%.
  
  Small and medium-sized mines use multi-purpose distillation tank for m ercury distillation, and large mines use distillation furnace.

 

Detailed Photos
Factory Supply M Ercury Distiller/M Ercury Retort for Gold Washing Gold Recovery Energy & Mining
Factory Supply M Ercury Distiller/M Ercury Retort for Gold Washing Gold Recovery Energy & Mining
Factory Supply M Ercury Distiller/M Ercury Retort for Gold Washing Gold Recovery Energy & Mining
Factory Supply M Ercury Distiller/M Ercury Retort for Gold Washing Gold Recovery Energy & Mining
Factory Supply M Ercury Distiller/M Ercury Retort for Gold Washing Gold Recovery Energy & Mining

 

Packaging & Shipping

Factory Supply M Ercury Distiller/M Ercury Retort for Gold Washing Gold Recovery Energy & Mining

FAQ

1. Are you a manufacturer ?
---- Yes , we own factory and have rich experience to provide professional solutions.

2. Can you do customization?
---- Yes , We accept client's requests of OEM & ODM, can do customized logo on products body or package with your own brand names, also we can do private label stick on each package.

3. How to make an order?
---- Please send us your email, receiving address and contact phone number, then order request link would be sent to you to check and make the payment.

4. What is your payment terms and payment methods?
---- We can do 50% deposit before production, 50% balance before shipment delivery.Payment can be done via T/T, western union, or Cash, escrowing security order payment on alibaba.

5. What is your terms of delivery?

---- We accept EXW, FOB, CIF, etc. You can choose the one which is the most convenient or cost effective for you.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2023

Suppliers with verified business licenses

Trading Company
Number of Employees
8
Year of Establishment
2021-06-29